Direct answer: Plan allergen changeovers on spice and powder lines as a written procedure: a set cleaning method, a frequency tied to line changeover, named responsibility, and checks that prove the equipment is clean. Dry cleaning with vacuums, brushes and wipes is common in low-moisture plants. Verify with visual checks, swabs or allergen test kits.
Key takeaways
- Sesame became the ninth major food allergen in the US on 1 January 2023, joining milk, eggs, fish, crustacean shellfish, tree nuts, peanuts, wheat and soybeans (FDA).
- FDA guidance says allergen cleaning procedures should be written and should state the purpose, frequency, who does the cleaning, how, what to monitor or verify, and what to do if it fails.
- In dry-cleaning operations, FDA describes tools such as vacuum cleaners, brooms, brushes and wipes, used to keep water out of the area and prevent microbial growth such as Salmonella.
- Verification can include visual inspection, ATP or protein swabs, and allergen-specific test kits. ATP swabs are non-specific: they show general cleanliness, not a particular allergen.
- Equipment design decides how long a changeover takes. Ask about tool-free disassembly and dead spots before you buy.
Why does sesame matter on a spice or powder line?
Short answer: Since January 2023, packaged foods sold in the US that contain sesame must declare it as an allergen. Plants that share equipment between sesame-containing and sesame-free products must prevent cross-contact. Spice, flour and powder lines are exposed because fine dust travels and settles in equipment, so a changeover plan is needed.
FDA states that sesame must be labelled as an allergen on packaged foods and dietary supplements, including where an ingredient is made from sesame. Other markets have their own allergen lists and rules, so check the requirements of every country you sell to. This article uses FDA’s published guidance as a worked reference; it is not legal advice.
What should a written allergen cleaning procedure contain?
Short answer: FDA’s draft guidance suggests a sanitation procedure that names the purpose, how often cleaning is done and how it relates to line changeover, who is responsible, the exact steps and tools, whether disassembly is needed, what is monitored or verified, and what corrective action applies. Keep forms with the procedure.
- Purpose: state that the aim is to prevent allergen cross-contact.
- Frequency: for example, at every changeover from an allergen-containing product to one without that allergen.
- Responsibility: name the role, not just “sanitation”.
- Method: tools, agents, sequence, and whether the machine is disassembled.
- Verification: what proves it worked.
- Corrective action: what happens if a check fails, including hold and re-clean.
- Records: a checklist signed at each step.
Dry cleaning or wet cleaning on a powder line?
Short answer: Many low-moisture lines avoid water, because moisture in powder equipment can support microbial growth. FDA describes dry cleaning with vacuum cleaners, brooms, brushes and wipes for this reason. Wet cleaning follows a sequence from pre-clean through rinse, detergent, post-rinse, inspection, sanitise and reassembly. Choose per machine, then dry it fully.
| Machine in a spice or powder line | What holds residue | Cleaning thought |
|---|---|---|
| Hopper and feeder | Corners, bridging aids, screw flights | Remove the screw; vacuum, then wipe |
| Hammer mill or pulverizer | Screen, hammers, grinding chamber, outlet duct | Open the casing; remove the screen; brush and vacuum; check beaters |
| Sifter or screen | Screen mesh, frame, discharge spouts | Spare screen set; inspect mesh against light |
| Conveyor or elevator | Belt joints, boot, buckets | Look for dead spots; clean boot first |
| Dryer (belt or fluid bed) | Belt surface, trays, ducts, filters | Follow the dry-cleaning steps; see below |
| Filler and packaging | Hopper, auger, funnel, seals | Tool-free removal of food-contact parts; clean and inspect |
The “cleaning thought” column is practical guidance, not a validated procedure. Validate each machine in your plant. For dryers, our guide to cleaning a mesh belt dryer sets out dry-cleaning steps and frequency, and the same logic applies to other low-moisture equipment. For fillers, see choosing a filling and packing machine for spices, flour and powders.
How do you prove the line is clean?
Short answer: Use more than one check. FDA lists visual inspection, ATP swabs, protein swabs and allergen-specific test kits, and notes a push-through method where an inert ingredient or the next product is run through and tested. Pick checks that fit the allergen and the matrix, record results and act on failures.
- Visual: look for residue at known hard spots, with a torch, after cleaning and before production.
- ATP swabs: fast, but they detect any organic residue, so they are a general cleanliness check.
- Protein swabs: detect protein residue left on a surface, which is nearer to allergen risk than a general ATP reading.
- Allergen test kits: specific to an allergen, where a kit exists for your food matrix.
- Push-through: run a carrier such as salt or sugar through and test it, or test the first product after changeover.
How should you schedule products to cut changeovers?
Short answer: Group products by allergen in campaigns and run the sesame-free or allergen-free product first in a cleaned line, with allergen-containing products later in the week. Each avoided full clean saves production time. The saving can be large, as the worked example shows, so scheduling is the cheapest control.
Worked example (illustrative assumptions, ours): a line runs 500 kg per hour and a full allergen changeover, including checks, takes 3 hours.
- Output lost per changeover = 500 kg/h × 3 h = 1,500 kg.
- With 8 changeovers a week, lost output = 12,000 kg (12 t).
- If grouping into campaigns cuts that to 3 changeovers a week, lost output = 4,500 kg, a saving of 7,500 kg a week.
Use your own line rate, cleaning time and product mix. The point is that the cleaning time is a real capacity cost, which should be part of equipment choice.
What should you ask equipment suppliers?
- Can food-contact parts be removed without tools, and how long does that take?
- Are there dead spots, ledges or screw threads inside the product path?
- Are surfaces smooth and welds ground, so residue does not stick?
- What materials are used for food-contact parts (for example SS304 or SS316)?
- Is there a dust extraction connection that does not spread dust during cleaning?
- Can spare screens or parts be supplied for changeovers?
GTI’s spices processing plant page lists spice cleaning, roasting, grinding, dehydration, blending and packaging within its turnkey scope, and its sesame processing page covers sesame lines. Ask GTI to confirm cleaning access, materials and changeover features for the machines in your project. Our sesame dehulling guide covers the process side.
FAQ
Does this apply outside the US?
Allergen lists and labelling rules differ by country. The cleaning principles are broadly similar, but confirm the rules for each market you supply.
Is a dry-clean enough after a sesame run?
It can be, if the procedure is written, validated and verified for your equipment. Verification is the key step, not the method name.
Are ATP swabs enough?
Not on their own. FDA notes ATP tests are non-specific. Combine them with visual checks and, where available, allergen-specific tests.
Talk to GTI about your project
Planning a spice or powder line that must handle allergen changeovers? Contact Genex Tech Industries LLP (GTI Group) to discuss your material, production capacity, product specifications and utility requirements. To help us respond usefully, please share your product or raw material, required capacity, feed and final moisture (state wet or dry basis), finished-product specification, available utilities, installation location and project timeline.
Email: mktg@foodtechprojects.com
Call or WhatsApp: +91-93300-77417 | +91-87774-75596 (WhatsApp)
Website: https://foodtechprojects.com/
For Industrial Dryers: https://gtidryers.com
This article gives general technical guidance. Figures marked as illustrative are examples, not plant guarantees. Equipment selection and performance for your material should be confirmed through trials and engineering assessment.
References